PRIMARY SERVICE PROJECT FOR 20,000 SOCIAL HOUSING IN THE TOWN OF OUEDO MUNICIPALITY OF ABOMEY CALAVI: DEVELOPMENT WORK OF THE PRIMARY DRINKING WATER SUPPLY NETWORK

The work consists of creating the primary drinking water supply network for the city of Ouédo through:

      • The completion of 03 high-volume boreholes;

      • Laying of large diameter pipe over 17 km;

      • The construction of 03 technical buildings housing the drilling with the equipment electromechanical and energy relay generators;

      • The construction of valve chambers and manholes equipped with hydraulic parts.

    PROJECT TO CREATE 24 DRINKING WATER SUPPLY SYSTEMS: CREATION WORK ON FIVE (05) VILLAGE WATER SUPPLIES IN THE DEPARTMENTS OF COUFFO, MONO AND ZOU IN BENIN

    The project consists of creating castles in the departments of Couffo, Mono and Zou through the following works:

    • The creation of 2 truncated conical castles in reinforced concrete of 300 m3 and 150m3;
    • The creation of a square castle of 60m3;
    • The creation of a circular castle of 30m3;
    • Laying large and small diameter pipes over 74 km;
    • The completion of 32 boreholes;
    • The construction of 04 pumping stations technical buildings housing the drilling with electromechanical equipment and energy relay generators;
    • Construction of valve chambers and manholes equipped with hydraulic parts;
    • Installation of low voltage LV line.

    MISSION OF COMPLETE TECHNICAL FEASIBILITY STUDIES, SUMMARY DRAFT AND DEFINITIVE DRAFT, HYDROGEOLOGICAL AND GEOPHYSICAL PROJECT IN ORDER TO STRENGTHEN DRINKING WATER SUPPLY SYSTEMS IN 21 LOCALITIES IN BENIN: ALLADA, GLO -DJIBGE, OUIDAH, SO-AVA, TOFFO, TORI-BOSSITO, ADJOHOUN, BONOU, DANGBO, AKPRO-MISSERETE, AVRANKOU, IFANGNI, POBE, ADJA-OUERE, KETOU, KANDI, MALANVILLE, SEGBANA, N’DALI, PERERE, SINANDE AND THEIR SURROUNDINGS, ON BEHALF OF THE MINISTRY IN CHARGE OF WATER AND UNDER NATIONAL BUDGET FUNDING

    The objective of the study mission is to increase the capacity of production of existing hydraulic infrastructures. Indeed, the National Water Company of Benin currently operates drinking water supply systems (AEP) of very different sizes supplying 69 capitals including Allada, Glo-Djibgé, Ouidah, So-Ava, Toffo, Tori-Bossito , Adjohoun, Bonou, Dangbo, Akpro-Missérété, Avrankou, Ifangni, Pobè, Adja-Ouéré, Kétou, Kandi, Malanville, Ségbana, N’Dali, Pèrèrè, Sinandé and their surrounding areas. These cities are experiencing quite significant urban development while their AEP system, which has been in service for around twenty years, has not recorded any development in extension and densification, by taking into account the demographic growth observed in recent years in these cities.

    The aim of the study mission is to first have a preliminary summary of the project study and secondly detailed technical studies on:

      • The exploitation of groundwater through the identification of well fields in the project localities for the drinking supply of 21 towns and their surroundings;

      • A preliminary summary indicating the estimated cost of the works to be carried out for the drinking water supply of the said towns as well as a financial analysis of the variants;

      • Detailed technical studies and execution plans necessary for carrying out work to strengthen production capacities and water treatment stations, construction of water towers, water storage tanks, extension and densification of existing distribution networks.

    Creation of an extension of an underground low voltage line for the electrical supply of the pumping station of the drinking water network of Ouedo social housing site in Benin, financing BOAD, “Société Immobilière d’Aménagement Urbain” (SIMAU) 2021- 2022

    Supply and installation of three generators of 120 to 160 KVA for the relay electricity supply of the pumping station of the drinking water network of Ouedo social housing site in Benin, financing BOAD, “Société Immobilière d’Aménagement Urbain” (SIMAU ) 2021-2022

    Technical feasibility study and monitoring-control of the execution of the work to create the solar photovoltaic system for pumping water as part of the hydro-agricultural development of the Komdè site in the commune of Ouaké in northern Benin, financing Local Project, Ouaké Town Hall, 2021-2022

    Control and monitor the execution of work to create solar photovoltaic systems for pumping water as part of the development of market gardening areas in the municipalities of Abomey-Calavi, Sèmè-Kpodji, Dangbo, Akpro-Missérété, Bonou, Adjohoun, Covè, Zangnanado, Agricultural Infrastructure Support Project in the Ouémé Valley in Benin, Ministry in charge of Agriculture, African Development Bank financing, 2021-2023

    Construction of a medium and low voltage line extension for the electrical supply of the pumping stations of the drinking water networks of several localities in the south of Benin (National Agency for the Supply of Drinking Water in Rural Areas, Benin) 2021 -2022

    Project management mission in order to strengthen the drinking water supply systems of the towns of Boukoumbé, Covè and Zangnanado and their surroundings, National Water Company of Benin / Ministry in charge of Water in Benin, 2022-2023

    Project management mission in order to strengthen the drinking water supply systems of the towns of Boukombé, Covè and Zangnanado and their surroundings, National Water Company of Benin / Ministry in charge of Water in Benin, 2022-2023